Full Fitout & Renovation

Bathroom Installations
Boksburg

From a single tap replacement to a complete bathroom renovation — our certified installation plumbers deliver expert workmanship with meticulous attention to detail.

PIRB Licensed New Builds & Renovations 12-Month Guarantee
Book a Free Consultation
073 707 8085

Mon–Sat 07:00–18:00 • Emergencies anytime

  • All Fixture Types & Brands
  • SANS Compliance Certificates
  • Works with Your Contractor Team
Bathroom renovation and installation in Boksburg

Expert Bathroom Installations in Boksburg

Whether you're replacing a leaking toilet, upgrading to a rain shower, or fitting out a brand new bathroom from scratch, our installation plumbers bring the same level of skill and care to every project. We work neatly, efficiently, and leave a clean site when we're done.

We work alongside tilers, electricians, and builders on full renovation projects, and can project-manage the plumbing phase for you to ensure everything is completed in sequence. All work meets SANS standards and we issue compliance certificates on larger installations.

What We Install

  • Toilets — close-coupled, BTW (back-to-wall), wall-hung, and standard
  • Basins, vanity units, and countertop basins
  • Shower enclosures, trays, and wet room drains
  • Freestanding and built-in baths with all pipework
  • Mixer taps, thermostatic showers, and rain shower heads
  • Towel rails and heated towel bars (where plumbing connection required)
  • Full bathroom plumbing for new builds
  • Replumbing for renovation and reconfiguration projects

Our Installation Process

  1. 1
    Consultation & Quote

    We visit your property to assess the existing plumbing, discuss your plans, and provide a detailed written quote. No obligation — we're happy to advise even if you're still deciding.

  2. 2
    First Fix (rough-in)

    For new builds or relocations, we run the supply and waste pipes to the new positions before tiling. This phase requires careful measurement to ensure everything lines up correctly.

  3. 3
    Second Fix (fitting)

    Once tiling is complete, we return to install all the fixtures — connecting toilets, basins, showers, and baths to the rough-in pipework.

  4. 4
    Testing & Commissioning

    Every fixture is tested for correct operation, secure connections, and proper drainage. We check water pressure, flow rates, and waste run-off before signing off.

  5. 5
    Clean Up & Handover

    We leave a clean, tidy site. You receive a walk-through of everything installed, care instructions for fittings, and our 12-month workmanship guarantee.

Planning a full bathroom renovation? We collaborate closely with tilers, painters, and electricians to keep your project on schedule. Call us early in the planning phase so we can co-ordinate the plumbing timeline with your other contractors.